Proposal Builder Large and Small Business Menu Command Summary

PropAdmn (Main Menu)

  Compact

    ProposalDatabase :   Defragment a Specified System Proposal

    MainDatabase :   Defragment the System’s Main Database File

  Encrypt/Decrypt :   Encrypt or Decrypt a System Proposal

  Fix :   Attempt to Repair a Damaged System Proposal

  Backup :   Copy an Existing System Proposal to a Specified Storage Device and Folder as Protection Against Loss or Damage to the Subject Proposal

  Copy

    EntireProposal :   Create a New System Proposal as a Duplicate of a Specified System Proposal and Save It to a Specified Storage Device and Folder

    LogicandElements :   Create a New System Proposal with the Cost Logic and Elements of a Specified System Proposal and Save It to a Specified Storage Device and Folder

  Delete :   Delete a Specified System Proposal from Storage (Recovery not Possible)

  Rename :   Change the Name of an Existing System Proposal and/or Move It from Its Current Folder to a New Folder

  Information :   Show Pertinent System Information

  Passwords

    Proposal

      Set :   Assign Password Protection to a Specified System Proposal

      Remove :   Remove Password Protection from a Specified System Proposal

    PropAdmn

      Set :   Assign Password Protection to the Main Database File

      Remove :   Remove Password Protection from the Database File

  DeActivate :   Deactivate the Proposal Builder Application on the Current Computer in Preparation for Transfer to Another Computer

PropOpen

  Old :   Activate a Specified System Proposal that Already Exists

  New :   Create and Activate a New System Proposal

  DefaultFileFolder :   Set the Active Folder (Default Subdirectory Path) When the System is Started

  UserAccess

      Customize :   Enable and Disable Selected System Menu items (Used for System Administration)

      Password

        Set :   Assign Password Protection to the UserAccess Menu item

        Remove :   Remove Password Protection from the UserAccess Menu Item

Help

  HelpSystemOverview :   Basic Guidance on Obtaining System Help

  About SPS :   Displays Information About the Standard Proposal System

Exit

  No :  Stop the Exit Process and Remain in the System

  Yes :  Exit the System

PropAdmn (Proposal Menu)

  Information

    Proposal :  Show Pertinent Information for the Active Proposal

    System :  Show Pertinent System Information

  MonitorTaskStatus :  Track Proposal Data Entry Status by Task for the Active Proposal

  ValueEntryTemplates

    Define :  Define Custom Templates for Allocating Total Base Values Over Proposal Periods for the Active Proposal

    PrintTable :  Print a Summary Table of All Custom Templates for Allocating Total Base Values Over Proposal Periods for the Active Proposal

    ViewTable :  View/Display a Summary Table of All Custom Templates for Allocating Total Base Values Over Proposal Periods for the Active Proposal

    ChartTable :  View/Display a Summary Table and Graphs of All Custom Templates for Allocating Total Base Values Over Proposal Periods for the Active Proposal

  Settings

    ANSIFileStructure :  Specify the Data Elements to Be Included in the ANSI Proposal File for the Active Proposal (TS 805, Rate Element Identification Segments, Hierarchical Structure References and TS 251)

    ExternalFileImport :  View and Change the Import Method and Field Delimiter for Each External File Whose Data Can Be Imported Into the System for the Active Proposal

    TS251BOMDataEntryMode :  Specify Whether Base Unit Prices are to Be Adjusted and, If So, by Dollar Entries or by Factors for the Active Proposal

    WBSFormat :  Change the Format of the Work Breakdown Structure

BuildStructure

  Element :  Define the Active Proposal’s Cost Elements

  Period :  Define the Active Proposal’s Performance and Cost Estimating Periods

  LineItem :  Define the Active Proposal’s Line Item Numbers

  WBS :  Define the Active Proposal’s Work Breakdown Structure Items

  SOW :  Define the Active Proposal’s Statement of Work Items

  Task :  Define the Active Proposal’s Basic, Underlying Structure

  CostLogic :  Define the Active Proposal’s Cost Element Relationships and Estimating Formulas

DataEntry

  DetailedCostData

    Bases :  Enter Direct Inputs for the Active Proposal by Cost Element and Task

    Rates :  Enter Rates and Factors for the Active Proposal by Cost Element

    TS251PricingSupport

      EssentialAdmnData :  Enter Essential Administrative Data for the Pricing Support That Will Be Included as a Separate Transaction Set 251 for the Active Proposal

      BillofMaterial :  Enter a Bill of Material That Will Be Included in a Separate Transaction Set 251 for the Active Proposal

  Essential :  Enter Essential Administrative Data for the Active Proposal

  Non-Essential

    RelatedTransactionSets :  Enter References to Other Related Transaction Sets for the Active Proposal

    PertinentParties :  Identify Pertinent Organizations and Provide Relevant Information for the Active Proposal

    LineItemDetails :  Identify Each Line Item Being Proposed and Provide Details for the Active Proposal

    ContractandCASData :  Provide Contract and Cost Accounting Standards Data for the Active Proposal

    MonetaryAmounts :  Specify Total Monetary Amounts for the Active Proposal

  GeneralText :  Enter Information into the Active Proposal Not Included Elsewhere

  ControlSegments

    InterchangeControlSegment :  Define an Interchange of One Functional Group and Provide Control Information for the Active Proposal

    FunctionalGroupSegment :  Define a Functional Group and Provide Control Information for the Active Proposal

ANSI

  Translate

    ProposalSegmentsOnly :  Translate the Active Proposal into an ASCII Text File Using ASC X-12 Standards With No Control Segment Enclosure

    AllSegments

      SingleProposal :  Translate the Active Proposal into an ASCII Text File Using ASC X-12 Standards and Enclose It Within Specified Control Segments

      MultipleProposals :  Translate the Active Proposal and Other Specified Proposals into an ASCII Text File Using ASC X-12 Standards and Enclose It Within Specified Control Segments

  Copy :  Create a Duplicate of the Translated ASCII Text File for the Active Proposal and Save It to a Specified Storage Device and Subdirectory

  Delete :  Delete an Active Proposal’s Translated ASCII Text File

ValidationModel

  Create :  Convert a Proposal’s ANSI .txt File into an MS Excel Workbook (Allows Both Proposal Validation and Sensitivity Analysis)

  Structure

    SetAmountColumnsDecimalPlaces :  Set Decimal Places and Rounding for Amount Columns

    SetBaseColumnsDecimalPlaces :  Set Decimal Places only (i.e., no Rounding) for Base Columns

    SetRateColumnsDecimalPlaces :  Set Decimal Places only (i.e., no Rounding) for Rate Columns

Import

  Data

    BillofMaterial :  Import Bill of Material Data into the Active Proposal from an External File

    DirectInputs :  Import Numeric Base Data into the Active Proposal from an External File

    RatesandFactors :  Import Numeric Rate Data into the Active Proposal from an External File

  Structure

    Element :  Import Cost Element Structure into the Active Proposal from an External File

    LineItem :  Import Line Item Structure into the Active Proposal from an External File

    WBS :  Import Work Breakdown Structure into the Active Proposal from an External File

    SOW :  Import Statement of Work Structure into the Active Proposal from an External File

Help

  HelpSystemOverview :  Basic Guidance on Obtaining System Help

  About SPS :  Displays Information About the Standard Proposal System

MainMenu

  No :  Remain in the Proposal Menu

  Yes :  Return to the System’s Main Menu

Exit

  No :  Stop the Exit Process and Remain in the System

  Yes :  Exit the System